New Construction Wiring in Sammamish
On a new build the electrical is judged on whether it holds up the schedule.
The whole scope, one crew
A ground-up build is the one chance to put the electrical exactly where it should be before anything constrains it: switches where the room will actually want them, lighting planned with the ceiling rather than after it, and a service sized for the house you are really building rather than the one on the original spec. That last point matters here. Plateau houses are large and the equipment list keeps growing. Sizing the service for two chargers and a heat pump now costs very little; retrofitting it costs a great deal. We take the whole scope — temporary power, service entrance, rough-in, inspections, trim — so there is one figure, one crew and one set of dates.
What is included
Temporary power and the service entrance
Power on site when the trades need it, and the permanent service established with the utility.
A full rough-in
Every circuit run, boxes set, lighting layout walked with you before anything is covered.
Inspection management
Rough and final inspections filed and attended, timed so the build is not waiting on us.
Final trim and handover
Devices, plates and fixtures, everything tested, panel labelled, paperwork handed over.
Where we fit in
Plans at permit stage
The best moment to involve us; lighting and circuit decisions cost nothing to change now.
Framing complete
Rough-in slots into the window between framing and insulation, and we hold the dates.
Several trades on site
We work to the construction schedule and tell your builder directly if anything moves.
An owner-built project
We are used to owners running their own build and will flag the early decisions.
How the work runs
Price the plans
A full scope and a fixed figure from the drawings.
Temporary and service
Site power early, permanent service coordinated with the utility.
Rough-in and inspect
Run, walked with you, inspected before close-up.
Trim and hand over
Fixtures and devices at the end, tested and documented.
Questions about this work
Do you work with our general contractor?
Yes, and most new-build work arrives that way. Your builder gets dates and a direct number.
Can we change the lighting after rough-in?
Small changes sometimes. Anything structural is far cheaper before, which is why we walk the plan with you first.
Should we size the service for future loads?
Almost always yes on a house this size. Allowing for a second charger and a heat pump at build time is a rounding error against doing it later.
Price the electrical on your build
Send the drawings or call. The quote and the planning conversation are free.